Industrial Partners USA

1-269-357-7550

  • Home
  • Our Company
  • Developments
    • FCIP South Park - Phase 1
    • FCIP South Park - Phase 2
    • Pavilion - 109 Acre Site
    • Portage - 35 Acre Site
    • Mattawan - 48 Acre Site
    • Grayling - 40 Acre Site
  • Contact Us
  • More
    • Home
    • Our Company
    • Developments
      • FCIP South Park - Phase 1
      • FCIP South Park - Phase 2
      • Pavilion - 109 Acre Site
      • Portage - 35 Acre Site
      • Mattawan - 48 Acre Site
      • Grayling - 40 Acre Site
    • Contact Us

1-269-357-7550

Industrial Partners USA

  • Home
  • Our Company
  • Developments
  • Contact Us

109 Acre Site - Pavilion, MI

Industrial Partners USA is developing a 109 acre Industrial Site with 4 phases capable of housing 100,000 S.F. up to 1,208,900 S.F. of available space. Each phase will add approximately 270,000 S.F. of Modern Industrial Space, with Phase 1 beginning in (Month) of 2022. This site has easy access to I-94 and the option to add a rail spur that will equip the site with the ideal conditions for distribution.

117+ Acre Site - Pavilion, MI

Market Details

The 20 Fortune-1000 companies that are headquartered or physically present, along with a skilled workforce diversified in primary industry sectors, have made the region a leader in manufacturing medical devices, pharmaceuticals, packaging, agriculture, food processing and design-based manufacturing.


The Region:

  • World Headquarters for the Kellogg Company, Stryker Corporation and Whirlpool Corporation
  • Site selected by more than 100 international companies
  • Top performer among metropolitan statistical areas for employment in Drugs and Pharmaceuticals, and Medical Device Equipment


Strategic midpoint location between Chicago and Detroit that is within a one day’s drive of: 

  • 54% of the nation’s manufacturers
  • 48% of all national retail sales
  • 54% of the nation’s business payroll
  • 65% of Canada’s Gross National Product


HIGH DEMAND FOR CLASS A DISTRIBUTION SPACE THAT DOES NOT CURRENTLY EXIST.  


LITTLE TO NO VACANCY AMONGST 3PL & WAREHOUSE COMPANIES.   

Building Specification

- Site Area: 109 Acres

- Total S.F.: 100,000 S.F. Up to 1,208,900 S.F.

- Office Space: TBD

- Ceiling Height: 36 FT Clear

- Column Spacing: 50' x 50' & 60' x 50' at Docks

- Construction: Pre-Engineered Steel

- Dock Doors: 96 (40 Additional Knockouts) 

 -Overhead Doors: 12 locations

- Fire Suppression: ESFR

- Electric Service: up to 100,000+ Amp/480V/3P available

- Lighting: Motioned LED Interior - 35' Candles

- Floors: 6" + Determined by Tenant

- Climate Control: HVAC in Office & Thermocycler Heating


Additional Info

- 50% Property Tax Abatement for 12 years

- Rail Spur Available on Site and can add 115,500 to building by eliminating South Docks

Contact Us

FULL SITE RENDERINGS

    Other DEVELOPMENTS

    FCIP South Park - Phases 2 & 3

    FCIP South Park - Phases 2 & 3

    FCIP South Park - Phases 2 & 3

     Industrial Partners USA will complete Phases 2 and 3 in Spring of 2023, with the full FCIP South Park site totaling 460,000 SF of available Industrial Space. This site has easy access to highway and high visibility along I-94.  

    40 Acre Site - Grayling, MI

    FCIP South Park - Phases 2 & 3

    FCIP South Park - Phases 2 & 3

     Industrial Partners USA is prepared to develop this 40+ acre site that is capable of housing between 50,000 - 250,000 SF of build-to-suit Industrial Space. 


    Copyright © 2021 Industrial Partners USA - All Rights Reserved.

    Main: 1-269-357-7550